Heat recovery of compressors and torches

The project consisted of improving the water pumping and distribution system at the plant by incorporating waste heat recovery from the system with the new equipment installed. Through this energy efficiency improvement project, energy savings of 47.38 toe/year have been achieved. This project has been subsidized by the “Program of aid for energy efficiency actions […]
Replacement of the pumping system

The project involved the replacement of the initial pumping, filtration and water distribution system with another based on a single pump and a ring distribution system. Through this energy efficiency improvement project, energy savings of 26.44 toe/year have been achieved. This project has been subsidized by the Program of aid for energy efficiency actions in […]
EXP. ICA028/22/000007 BIOMASS BURNER 12MW
Installation of a 12 MWt biomass combustion chamber to generate the hot air required in the existing drying trommel that used natural gas as fuel and where the fruit pulp is dehydrated, thereby increasing the energy efficiency of the facility, reducing the industry’s natural gas consumption, promoting the use of renewable energies and contributing to […]
EXP. ICA028/22/000008 BIOMASS BOILER 15 MWT.
Installation of a 15 MWt biomass boiler to generate steam, and use its thermal energy to satisfy part of the steam demand of the industry’s production process, reducing the consumption of natural gas in the process, thus contributing to the reduction of emissions and CO2 and the decarbonization of the industry. to the process, thus […]